CVE intelligence and bounded remediation
CVE-2026-59762 — When an HTTP/2 profile is configured on a virtual server, undisclosed requests can cause an increase in memory resource utilization
When an HTTP/2 profile is configured on a virtual server, undisclosed requests can cause an increase in memory resource utilization. Impact: System performance can degrade until the TMM process is either forced to restart or is manually restarted. This vulnerability allows a remote, unauthenticated attacker to cause a degradation of service that can lead to a denial-of-service (DoS) on the BIG-IP system. There is no control plane exposure; this is a data plane issue only. Note: Software versions which have reached End of Technical Support (EoTS) are not evaluated.
- Severity
- High
- CVSS
- 8.7 (4.0)
- Published
- 2026-07-15
- CISA KEV
- Not currently listed
- Ecosystem
- software/application
- Weaknesses
- CWE-770
Affected products
No browser-safe affected-product rows are available.
Matched remediation archetype
Resource exhaustion and denial of service
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
- Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
- Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.
Remediate safely
- Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
- Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
- Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.