CVE intelligence and bounded remediation

CVE-2026-5071 — Zephyrproject Zephyr security vulnerability

High CVSS 7.8

The SocketCAN implementation validates the length of a user-provided buffer containing a socketcan_frame object using only a NET_ASSERT statement in zcan_sendto_ctx() before dereferencing it in socketcan_to_can_frame(). In production builds where assertions are disabled, a userspace application that controls the length passed to a sendto syscall can supply an incomplete or truncated frame, causing socketcan_to_can_frame() to dereference fields beyond the end of the buffer. This results in an out-of-bounds read that can cause denial-of-service crashes or, because the parsed frame contents are transmitted on the network, leak adjacent memory.

Severity
High
CVSS
7.8 (3.1)
Published
2026-05-30
CISA KEV
Not currently listed
Ecosystem
operating-system
Weaknesses
CWE-125

Affected products

  • zephyrproject / zephyr

Matched remediation archetype

Buffer bounds, memory safety, and memory corruption

This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.

Check exposure

  • Identify affected native-code versions, build flags, architectures, parsers, codecs, drivers, and input paths in all shipped artifacts.
  • Determine whether untrusted data reaches the affected routine and the process privilege, sandbox, and network exposure.
  • Confirm statically linked, vendored, firmware, and platform-provided copies, not only package-manager records.

Remediate safely

  • Apply the maintained upstream correction or replace the affected component, then rebuild every dependent artifact from clean inputs.
  • Adopt bounds-checked interfaces, validated sizes and integer conversions, clear ownership, and memory-safe components where practical.
  • Enable supported compiler and runtime hardening and add sanitized tests and fuzz regression seeds derived from non-weaponized fixtures.

Authoritative sources

Complete CVE record and remediation plan

The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.