CVE intelligence and bounded remediation
CVE-2026-50021 — pnpm is a package manager
pnpm is a package manager. Prior to 10.34.0 and 11.4.0, pnpm's tarball extraction worker skips integrity verification when the integrity field is absent from the lockfile resolution. If an attacker can both modify pnpm-lock.yaml to remove the integrity: field and cause the referenced registry URL to serve altered package content, pnpm install --frozen-lockfile can install the altered package without an integrity error. npm's npm ci enforces integrity by default; pnpm's behavior of silently skipping verification is a pnpm-specific fail-open gap. This vulnerability is fixed in 10.34.0 and 11.4.0.
- Severity
- High
- CVSS
- 8.1 (3.1)
- Published
- 2026-06-25
- CISA KEV
- Not currently listed
- Ecosystem
- javascript/npm
- Weaknesses
- CWE-354
Affected products
- pnpm / pnpm
Matched remediation archetype
General vulnerability remediation
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Confirm the affected component, deployment paths, reachable interfaces, and enabled features from inventories and configuration, without probing production destructively.
- Compare the advisory's affected conditions with the repository lockfiles, build manifests, artifacts, and runtime inventory.
- Identify data sensitivity, trust boundaries, and privilege level for every confirmed affected deployment.
Remediate safely
- Apply a vendor-supported fix or remove the affected component or feature; record the selected change and its source in the repository.
- Update direct and transitive dependency locks, generated artifacts, deployment manifests, and asset inventories together.
- Add a regression test for the documented unsafe condition using inert inputs and preserve rollback instructions.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.