CVE intelligence and bounded remediation
CVE-2026-47067 — Allocation of Resources Without Limits or Throttling vulnerability in benoitc hackney allows Flooding
Allocation of Resources Without Limits or Throttling vulnerability in benoitc hackney allows Flooding. The URL parser in src/hackney_url.erl converts every unrecognized URL scheme to a permanent BEAM atom via binary_to_atom/2. BEAM atoms are never garbage-collected and the atom table defaults to a hard limit of 1,048,576 entries. An attacker who can supply URLs with attacker-chosen scheme prefixes — directly as request targets, as configured webhook URLs, or via Location headers followed during redirects — can exhaust the atom table and crash the entire BEAM VM with system_limit. This issue affects hackney: from 2.0.0 before 4.0.1.
- Severity
- High
- CVSS
- 8.7 (4.0)
- Published
- 2026-05-25
- CISA KEV
- Not currently listed
- Ecosystem
- software/application
- Weaknesses
- CWE-770
Affected products
- benoitc / hackney
Matched remediation archetype
Resource exhaustion and denial of service
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
- Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
- Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.
Remediate safely
- Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
- Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
- Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.