CVE intelligence and bounded remediation
CVE-2026-44579 — Next.js is a React framework for building full-stack web applications
Next.js is a React framework for building full-stack web applications. From to before 15.5.16 and 16.2.5, applications using Partial Prerendering through the Cache Components feature can be vulnerable to connection exhaustion through crafted POST requests to a server action. In affected configurations, a malicious request can trigger a request-body handling deadlock that leaves connections open for an extended period, consuming file descriptors and server capacity until legitimate users are denied service. This vulnerability is fixed in 15.5.16 and 16.2.5.
- Severity
- High
- CVSS
- 7.5 (3.1)
- Published
- 2026-05-13
- CISA KEV
- Not currently listed
- Ecosystem
- software/application
- Weaknesses
- CWE-770, CWE-833
Affected products
- vercel / next.js
Matched remediation archetype
Resource exhaustion and denial of service
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
- Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
- Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.
Remediate safely
- Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
- Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
- Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.