CVE intelligence and bounded remediation
CVE-2026-41078 — OpenTelemetry dotnet is a dotnet telemetry framework
OpenTelemetry dotnet is a dotnet telemetry framework. In 1.6.0-rc.1 and earlier, OpenTelemetry.Exporter.Jaeger may allow sustained memory pressure when the internal pooled-list sizing grows based on a large observed span/tag set and that enlarged size is reused for subsequent allocations. Under high-cardinality or attacker-influenced telemetry input, this can increase memory consumption and potentially cause denial of service. There is no plan to fix this issue as OpenTelemetry.Exporter.Jaeger was deprecated in 2023.
- Severity
- Medium
- CVSS
- 5.9 (3.1)
- Published
- 2026-04-23
- CISA KEV
- Not currently listed
- Ecosystem
- software/application
- Weaknesses
- CWE-770
Affected products
- opentelemetry / opentelemetry
- opentelemetry / opentelemetry / 1.6.0
Matched remediation archetype
Resource exhaustion and denial of service
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
- Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
- Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.
Remediate safely
- Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
- Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
- Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.