CVE intelligence and bounded remediation

CVE-2026-28742 — Naxclow devices use a uniform request-signing scheme based on a hard-coded, platform-wide salt embedded in every firmware image

Critical CVSS 9.8

Naxclow devices use a uniform request-signing scheme based on a hard-coded, platform-wide salt embedded in every firmware image. Once this salt is recovered from any device, an attacker can generate valid signatures for arbitrary device or account operations due to the absence of per-device keys, server-side nonce tracking, or replay protections. Combined with the system’s use of plain HTTP for control-plane traffic, the construction enables broad request forgery and impersonation across the platform.

Severity
Critical
CVSS
9.8 (3.1)
Published
2026-06-12
CISA KEV
Not currently listed
Ecosystem
software/application
Weaknesses
CWE-321

Affected products

No browser-safe affected-product rows are available.

Matched remediation archetype

Cryptography, certificate, signature, and channel validation

This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.

Check exposure

  • Inventory affected algorithms, key uses, trust stores, certificate validation settings, random sources, and plaintext channels across clients and services.
  • Determine which secrets, identities, signatures, or data protections depend on the affected primitive or validation path.
  • Check debug, compatibility, fallback, and hostname or audience override settings in build and runtime configuration.

Remediate safely

  • Use a maintained platform cryptographic API with approved algorithms, modes, parameters, randomness, and full peer identity validation.
  • Remove insecure fallback and validation bypasses; separate keys by purpose and load them from managed secret storage.
  • Plan rotation or reissuance for affected keys, certificates, tokens, hashes, or ciphertext and document compatibility sequencing.

Authoritative sources

Complete CVE record and remediation plan

The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.