CVE intelligence and bounded remediation

CVE-2026-13585 — Allocation of Resources Without Limits and Throttling and Sensitive Inf… security vulnerability

High CVSS 8.2

Allocation of Resources Without Limits and Throttling and Sensitive Information in Resource Not Removed Before Reuse in the ASUS System Control Interface driver and ASUS Business Manager allow a local administrator to disclose sensitive information via crafted IOCTL requests, which, in severe cases, may lead to a Denial of Service (DoS) on the system. Refer to the ' Security Update for ASUS System Control Interface ' section on the ASUS Security Advisory for more information.

Severity
High
CVSS
8.2 (4.0)
Published
2026-07-15
CISA KEV
Not currently listed
Ecosystem
software/application
Weaknesses
CWE-226, CWE-770

Affected products

No browser-safe affected-product rows are available.

Matched remediation archetype

Resource exhaustion and denial of service

This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.

Check exposure

  • Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
  • Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
  • Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.

Remediate safely

  • Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
  • Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
  • Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.

Authoritative sources

Complete CVE record and remediation plan

The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.