CVE intelligence and bounded remediation

CVE-2026-12039 — Docker Sandboxes (sbx) enforces an HTTP/S-only egress allowlist but security vulnerability

Medium CVSS 5.7

Docker Sandboxes (sbx) enforces an HTTP/S-only egress allowlist but does not apply it to DNS resolution: the per-network embedded DNS server forwards any queried name to the host resolver whenever the network is internet-connected, without consulting the policy. A workload inside a sandbox, which the threat model treats as untrusted, can therefore encode data into DNS labels for an attacker-controlled domain and exfiltrate it through a DNS covert channel, bypassing the configured allowlist.

Severity
Medium
CVSS
5.7 (4.0)
Published
2026-06-18
CISA KEV
Not currently listed
Ecosystem
software/application
Weaknesses
CWE-923

Affected products

No browser-safe affected-product rows are available.

Matched remediation archetype

General vulnerability remediation

This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.

Check exposure

  • Confirm the affected component, deployment paths, reachable interfaces, and enabled features from inventories and configuration, without probing production destructively.
  • Compare the advisory's affected conditions with the repository lockfiles, build manifests, artifacts, and runtime inventory.
  • Identify data sensitivity, trust boundaries, and privilege level for every confirmed affected deployment.

Remediate safely

  • Apply a vendor-supported fix or remove the affected component or feature; record the selected change and its source in the repository.
  • Update direct and transitive dependency locks, generated artifacts, deployment manifests, and asset inventories together.
  • Add a regression test for the documented unsafe condition using inert inputs and preserve rollback instructions.

Authoritative sources

Complete CVE record and remediation plan

The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.