CVE intelligence and bounded remediation

CVE-2026-11362 — DataDog::DogStatsd versions through 0.07 for Perl allow metric injections from event tags

Critical CVSS 9.8

DataDog::DogStatsd versions through 0.07 for Perl allow metric injections from event tags. DataDog::DogStatsd does not properly sanitise input, allowing metric injections of data from untrusted sources. The format_event method (used by the event method) does not validate the content of the tags, which may contain commas (allowing tags to be injected) or newlines, pipes and colons that allow metric injections. (There is an ineffective s/|//g to remove pipes, but because the pipe is not escaped, it is interpreted as a regular expression metacharacter and has no effect.)

Severity
Critical
CVSS
9.8 (3.1)
Published
2026-06-05
CISA KEV
Not currently listed
Ecosystem
software/application
Weaknesses
CWE-93, CWE-150

Affected products

  • binary / datadog::dogstatsd

Matched remediation archetype

General vulnerability remediation

This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.

Check exposure

  • Confirm the affected component, deployment paths, reachable interfaces, and enabled features from inventories and configuration, without probing production destructively.
  • Compare the advisory's affected conditions with the repository lockfiles, build manifests, artifacts, and runtime inventory.
  • Identify data sensitivity, trust boundaries, and privilege level for every confirmed affected deployment.

Remediate safely

  • Apply a vendor-supported fix or remove the affected component or feature; record the selected change and its source in the repository.
  • Update direct and transitive dependency locks, generated artifacts, deployment manifests, and asset inventories together.
  • Add a regression test for the documented unsafe condition using inert inputs and preserve rollback instructions.

Authoritative sources

Complete CVE record and remediation plan

The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.