CVE intelligence and bounded remediation
CVE-2025-68133 — EVerest is an EV charging software stack
EVerest is an EV charging software stack. In versions 2025.9.0 and below, an attacker can exhaust the operating system's memory and cause the module to terminate by initiating an unlimited number of TCP connections that never proceed to ISO 15118-2 communication. This is possible because a new thread is started for each incoming plain TCP or TLS socket connection before any verification occurs, and the verification performed is too permissive. The EVerest processes and all its modules shut down, affecting all EVSE functionality. This issue is fixed in version 2025.10.0.
- Severity
- High
- CVSS
- 7.4 (3.1)
- Published
- 2026-01-21
- CISA KEV
- Not currently listed
- Ecosystem
- operating-system
- Weaknesses
- CWE-770
Affected products
- linuxfoundation / everest
Matched remediation archetype
Resource exhaustion and denial of service
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
- Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
- Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.
Remediate safely
- Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
- Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
- Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.