CVE intelligence and bounded remediation
CVE-2025-67269 — Gpsd Project Gpsd security vulnerability
An integer underflow vulnerability exists in the `nextstate()` function in `gpsd/packet.c` of gpsd versions prior to commit `ffa1d6f40bca0b035fc7f5e563160ebb67199da7`. When parsing a NAVCOM packet, the payload length is calculated using `lexer->length = (size_t)c - 4` without checking if the input byte `c` is less than 4. This results in an unsigned integer underflow, setting `lexer->length` to a very large value (near `SIZE_MAX`). The parser then enters a loop attempting to consume this massive number of bytes, causing 100% CPU utilization and a Denial of Service (DoS) condition.
- Severity
- High
- CVSS
- 7.5 (3.1)
- Published
- 2026-01-02
- CISA KEV
- Not currently listed
- Ecosystem
- software/application
- Weaknesses
- CWE-191
Affected products
- gpsd_project / gpsd
Matched remediation archetype
Resource exhaustion and denial of service
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
- Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
- Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.
Remediate safely
- Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
- Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
- Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.