CVE intelligence and bounded remediation
CVE-2025-27513 — OpenTelemetry dotnet is a dotnet telemetry framework
OpenTelemetry dotnet is a dotnet telemetry framework. A vulnerability in OpenTelemetry.Api package 1.10.0 to 1.11.1 could cause a Denial of Service (DoS) when a tracestate and traceparent header is received. Even if an application does not explicitly use trace context propagation, receiving these headers can still trigger high CPU usage. This issue impacts any application accessible over the web or backend services that process HTTP requests containing a tracestate header. Application may experience excessive resource consumption, leading to increased latency, degraded performance, or downtime. This vulnerability is fixed in 1.11.2.
- Severity
- High
- CVSS
- 7.5 (3.1)
- Published
- 2025-03-05
- CISA KEV
- Not currently listed
- Ecosystem
- software/application
- Weaknesses
- CWE-770
Affected products
No browser-safe affected-product rows are available.
Matched remediation archetype
Resource exhaustion and denial of service
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
- Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
- Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.
Remediate safely
- Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
- Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
- Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.