CVE intelligence and bounded remediation

CVE-2025-24190 — The issue was addressed with improved memory handling

Critical CVSS 9.8

The issue was addressed with improved memory handling. This issue is fixed in iOS 18.4 and iPadOS 18.4, iPadOS 17.7.6, macOS Sequoia 15.4, macOS Sonoma 14.7.5, macOS Ventura 13.7.5, tvOS 18.4, visionOS 2.4, watchOS 11.4. Processing a maliciously crafted video file may lead to unexpected app termination or corrupt process memory.

Severity
Critical
CVSS
9.8 (3.1)
Published
2025-03-31
CISA KEV
Not currently listed
Ecosystem
apple/platform
Weaknesses
CWE-400

Affected products

  • apple / ipados
  • apple / iphone_os
  • apple / macos
  • apple / tvos
  • apple / visionos

Showing 5 representative product identities from 9 source matches. Confirm exact affected versions with the linked vendor and NVD evidence.

Matched remediation archetype

Resource exhaustion and denial of service

This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.

Check exposure

  • Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
  • Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
  • Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.

Remediate safely

  • Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
  • Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
  • Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.

Authoritative sources

Complete CVE record and remediation plan

The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.