CVE intelligence and bounded remediation
CVE-2025-20111 — A vulnerability in the health monitoring diagnostics of Cisco Nexus 3000 Series Switches and Cisco Nexus 9000 Series Switches in...
A vulnerability in the health monitoring diagnostics of Cisco Nexus 3000 Series Switches and Cisco Nexus 9000 Series Switches in standalone NX-OS mode could allow an unauthenticated, adjacent attacker to cause the device to reload unexpectedly, resulting in a denial of service (DoS) condition. This vulnerability is due to the incorrect handling of specific Ethernet frames. An attacker could exploit this vulnerability by sending a sustained rate of crafted Ethernet frames to an affected device. A successful exploit could allow the attacker to cause the device to reload.
- Severity
- High
- CVSS
- 7.4 (3.1)
- Published
- 2025-02-26
- CISA KEV
- Not currently listed
- Ecosystem
- software/application
- Weaknesses
- CWE-1220
Affected products
No browser-safe affected-product rows are available.
Matched remediation archetype
Resource exhaustion and denial of service
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
- Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
- Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.
Remediate safely
- Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
- Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
- Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.