CVE intelligence and bounded remediation
CVE-2024-54002 — Dependency-Track is a Component Analysis platform that allows organizations to identify and reduce risk in the software supply chain
Dependency-Track is a Component Analysis platform that allows organizations to identify and reduce risk in the software supply chain. Performing a login request against the /api/v1/user/login endpoint with a username that exist in the system takes significantly longer than performing the same action with a username that is not known by the system. The observable difference in request duration can be leveraged by actors to enumerate valid names of managed users. LDAP and OpenID Connect users are not affected. The issue has been fixed in Dependency-Track 4.12.2.
- Severity
- Medium
- CVSS
- 5.3 (3.1)
- Published
- 2024-12-04
- CISA KEV
- Not currently listed
- Ecosystem
- software/application
- Weaknesses
- CWE-203
Affected products
No browser-safe affected-product rows are available.
Matched remediation archetype
Information disclosure and sensitive data exposure
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Trace sensitive data through responses, errors, logs, metrics, traces, caches, exports, files, backups, and client bundles.
- Identify affected subjects, tenants, retention windows, access controls, and downstream copies without opening unnecessary sensitive records.
- Review metadata, timing, status, length, and existence signals as well as direct content disclosure.
Remediate safely
- Minimize collection and output, apply field-level authorization and redaction at a centralized boundary, and return generic external errors.
- Remove secrets and sensitive data from logs, artifacts, URLs, caches, and client-side bundles; rotate credentials that may have been exposed.
- Update the affected component and add synthetic-data tests for response, error, observability, and export paths.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.