CVE intelligence and bounded remediation
CVE-2024-50003 — Linux Linux Kernel security vulnerability
In the Linux kernel, the following vulnerability has been resolved: drm/amd/display: Fix system hang while resume with TBT monitor [Why] Connected with a Thunderbolt monitor and do the suspend and the system may hang while resume. The TBT monitor HPD will be triggered during the resume procedure and call the drm_client_modeset_probe() while struct drm_connector connector->dev->master is NULL. It will mess up the pipe topology after resume. [How] Skip the TBT monitor HPD during the resume procedure because we currently will probe the connectors after resume by default. (cherry picked from commit 453f86a26945207a16b8f66aaed5962dc2b95b85)
- Severity
- Medium
- CVSS
- 5.5 (3.1)
- Published
- 2024-10-21
- CISA KEV
- Not currently listed
- Ecosystem
- linux/kernel
- Weaknesses
- CWE-476
Affected products
- linux / linux_kernel
- linux / linux_kernel / 6.12
Matched remediation archetype
Buffer bounds, memory safety, and memory corruption
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify affected native-code versions, build flags, architectures, parsers, codecs, drivers, and input paths in all shipped artifacts.
- Determine whether untrusted data reaches the affected routine and the process privilege, sandbox, and network exposure.
- Confirm statically linked, vendored, firmware, and platform-provided copies, not only package-manager records.
Remediate safely
- Apply the maintained upstream correction or replace the affected component, then rebuild every dependent artifact from clean inputs.
- Adopt bounds-checked interfaces, validated sizes and integer conversions, clear ownership, and memory-safe components where practical.
- Enable supported compiler and runtime hardening and add sanitized tests and fuzz regression seeds derived from non-weaponized fixtures.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.