CVE intelligence and bounded remediation
CVE-2024-4699 — ** UNSUPPORTED WHEN ASSIGNED ** A vulnerability, which was classified as critical, has been found in D-Link DAR-8000-10 up to 20230922
** UNSUPPORTED WHEN ASSIGNED ** A vulnerability, which was classified as critical, has been found in D-Link DAR-8000-10 up to 20230922. This issue affects some unknown processing of the file /importhtml.php. The manipulation of the argument sql leads to deserialization. The attack may be initiated remotely. The associated identifier of this vulnerability is VDB-263747. NOTE: This vulnerability only affects products that are no longer supported by the maintainer. NOTE: Vendor was contacted early and confirmed immediately that the product is end-of-life. It should be retired and replaced.
- Severity
- Critical
- CVSS
- 9.8 (3.1)
- Published
- 2024-05-14
- CISA KEV
- Not currently listed
- Ecosystem
- operating-system
- Weaknesses
- CWE-502
Affected products
- dlink / dar-8000-10_firmware
Matched remediation archetype
Unsafe deserialization and object reconstruction
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Inventory serialization formats accepted from requests, queues, caches, files, cookies, and cross-service messages.
- Trace whether untrusted input can select classes, types, callbacks, constructors, or object hooks during decoding.
- Identify signing, schema validation, trust-boundary, and compatibility settings for each decoder.
Remediate safely
- Replace native object deserialization with a data-only format and explicit schema validation.
- If replacement is not immediate, use a safe decoder with a minimal type allowlist and disable polymorphic or executable hooks.
- Update the affected library and add inert tests for unknown types, extra fields, malformed nesting, and unsigned data.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.