CVE intelligence and bounded remediation

CVE-2024-42487 — Cilium is a networking, observability, and security solution with an eBPF-based dataplane

Medium CVSS 4.3

Cilium is a networking, observability, and security solution with an eBPF-based dataplane. In the 1.15 branch prior to 1.15.8 and the 1.16 branch prior to 1.16.1, Gateway API HTTPRoutes and GRPCRoutes do not follow the match precedence specified in the Gateway API specification. In particular, request headers are matched before request methods, when the specification describes that the request methods must be respected before headers are matched. This could result in unexpected behaviour with security This issue is fixed in Cilium v1.15.8 and v1.16.1. There is no workaround for this issue.

Severity
Medium
CVSS
4.3 (3.1)
Published
2024-08-15
CISA KEV
Not currently listed
Ecosystem
software/application
Weaknesses
CWE-113, CWE-436

Affected products

  • cilium / cilium
  • cilium / cilium / 1.16.0

Matched remediation archetype

General vulnerability remediation

This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.

Check exposure

  • Confirm the affected component, deployment paths, reachable interfaces, and enabled features from inventories and configuration, without probing production destructively.
  • Compare the advisory's affected conditions with the repository lockfiles, build manifests, artifacts, and runtime inventory.
  • Identify data sensitivity, trust boundaries, and privilege level for every confirmed affected deployment.

Remediate safely

  • Apply a vendor-supported fix or remove the affected component or feature; record the selected change and its source in the repository.
  • Update direct and transitive dependency locks, generated artifacts, deployment manifests, and asset inventories together.
  • Add a regression test for the documented unsafe condition using inert inputs and preserve rollback instructions.

Authoritative sources

Complete CVE record and remediation plan

The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.