CVE intelligence and bounded remediation
CVE-2024-22189 — quic-go is an implementation of the QUIC protocol in Go
quic-go is an implementation of the QUIC protocol in Go. Prior to version 0.42.0, an attacker can cause its peer to run out of memory sending a large number of `NEW_CONNECTION_ID` frames that retire old connection IDs. The receiver is supposed to respond to each retirement frame with a `RETIRE_CONNECTION_ID` frame. The attacker can prevent the receiver from sending out (the vast majority of) these `RETIRE_CONNECTION_ID` frames by collapsing the peers congestion window (by selectively acknowledging received packets) and by manipulating the peer's RTT estimate. Version 0.42.0 contains a patch for the issue. No known workarounds are available.
- Severity
- High
- CVSS
- 7.5 (3.1)
- Published
- 2024-04-04
- CISA KEV
- Not currently listed
- Ecosystem
- software/application
- Weaknesses
- CWE-770
Affected products
No browser-safe affected-product rows are available.
Matched remediation archetype
Resource exhaustion and denial of service
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
- Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
- Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.
Remediate safely
- Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
- Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
- Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.