CVE intelligence and bounded remediation
CVE-2024-1638 — Zephyrproject Zephyr security vulnerability
The documentation specifies that the BT_GATT_PERM_READ_LESC and BT_GATT_PERM_WRITE_LESC defines for a Bluetooth characteristic: Attribute read/write permission with LE Secure Connection encryption. If set, requires that LE Secure Connections is used for read/write access, however this is only true when it is combined with other permissions, namely BT_GATT_PERM_READ_ENCRYPT/BT_GATT_PERM_READ_AUTHEN (for read) or BT_GATT_PERM_WRITE_ENCRYPT/BT_GATT_PERM_WRITE_AUTHEN (for write), if these additional permissions are not set (even in secure connections only mode) then the stack does not perform any permission checks on these characteristics and they can be freely written/read.
- Severity
- Critical
- CVSS
- 9.1 (3.1)
- Published
- 2024-02-19
- CISA KEV
- Not currently listed
- Ecosystem
- operating-system
- Weaknesses
- CWE-20
Affected products
- zephyrproject / zephyr
Matched remediation archetype
General vulnerability remediation
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Confirm the affected component, deployment paths, reachable interfaces, and enabled features from inventories and configuration, without probing production destructively.
- Compare the advisory's affected conditions with the repository lockfiles, build manifests, artifacts, and runtime inventory.
- Identify data sensitivity, trust boundaries, and privilege level for every confirmed affected deployment.
Remediate safely
- Apply a vendor-supported fix or remove the affected component or feature; record the selected change and its source in the repository.
- Update direct and transitive dependency locks, generated artifacts, deployment manifests, and asset inventories together.
- Add a regression test for the documented unsafe condition using inert inputs and preserve rollback instructions.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.