CVE intelligence and bounded remediation
CVE-2024-13943 — Tesla Model S Iris Modem QCMAP_ConnectionManager Improper Input Validation Sandbox Escape Vulnerability
Tesla Model S Iris Modem QCMAP_ConnectionManager Improper Input Validation Sandbox Escape Vulnerability. This vulnerability allows local attackers to escape the sandbox on affected affected Tesla Model S vehicles. An attacker must first obtain the ability to execute low-privileged code on the target system in order to exploit this vulnerability. The specific flaw exists within the QCMAP_ConnectionManager component. An attacker can abuse the service to assign LAN addresses to the WWAN. An attacker can leverage this vulnerability to access network services that were only intended to be exposed to the internal LAN. Was ZDI-CAN-23199.
- Severity
- High
- CVSS
- 7.8 (3.0)
- Published
- 2025-04-30
- CISA KEV
- Not currently listed
- Ecosystem
- operating-system
- Weaknesses
- CWE-20
Affected products
- tesla / model_s_firmware
Matched remediation archetype
General vulnerability remediation
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Confirm the affected component, deployment paths, reachable interfaces, and enabled features from inventories and configuration, without probing production destructively.
- Compare the advisory's affected conditions with the repository lockfiles, build manifests, artifacts, and runtime inventory.
- Identify data sensitivity, trust boundaries, and privilege level for every confirmed affected deployment.
Remediate safely
- Apply a vendor-supported fix or remove the affected component or feature; record the selected change and its source in the repository.
- Update direct and transitive dependency locks, generated artifacts, deployment manifests, and asset inventories together.
- Add a regression test for the documented unsafe condition using inert inputs and preserve rollback instructions.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.