CVE intelligence and bounded remediation

CVE-2024-11144 — The server lacks thread safety and can be crashed by anomalous data sent by an anonymous user from a remote network

Critical CVSS 9.2

The server lacks thread safety and can be crashed by anomalous data sent by an anonymous user from a remote network. The crash causes the FTP service to become unavailable, affecting all users and processes that rely on it for file transfers. If the crash occurs during file upload or download, it could lead to incomplete file transfers, potentially corrupting data. The repeated crash might also affect the stability of the underlying system, especially if it leads to resource leaks or affects other services.

Severity
Critical
CVSS
9.2 (4.0)
Published
2024-12-16
CISA KEV
Not currently listed
Ecosystem
software/application
Weaknesses
CWE-362

Affected products

No browser-safe affected-product rows are available.

Matched remediation archetype

Race condition, TOCTOU, and lifecycle synchronization

This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.

Check exposure

  • Map concurrent actors, shared state, lock boundaries, signals, callbacks, retries, and check-then-use sequences in the affected path.
  • Determine whether untrusted users can influence timing, object names, filesystem state, or repeated state transitions.
  • Identify clustered and multi-process behavior that repository-local tests may not represent.

Remediate safely

  • Make the sensitive state transition atomic or protect it with a consistently ordered synchronization primitive.
  • Perform authorization and invariant checks on the same authoritative object and transaction used for the operation.
  • Use unique private resources, safe ownership transfer, and idempotent operations; add deterministic concurrency regression tests.

Authoritative sources

Complete CVE record and remediation plan

The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.