CVE intelligence and bounded remediation
CVE-2023-7250 — A flaw was found in iperf, a utility for testing network performance using TCP, UDP, and SCTP
Medium
CVSS 5.3
A flaw was found in iperf, a utility for testing network performance using TCP, UDP, and SCTP. A malicious or malfunctioning client can send less than the expected amount of data to the iperf server, which can cause the server to hang indefinitely waiting for the remainder or until the connection gets closed. This will prevent other connections to the server, leading to a denial of service.
- Severity
- Medium
- CVSS
- 5.3 (3.1)
- Published
- 2024-03-18
- CISA KEV
- Not currently listed
- Ecosystem
- software/application
- Weaknesses
- CWE-183
Affected products
- es / iperf3
- redhat / enterprise_linux / 8.0
- redhat / enterprise_linux / 9.0
- redhat / enterprise_linux_for_arm_64 / 8.0_aarch64
- redhat / enterprise_linux_for_arm_64 / 9.0_aarch64
- redhat / enterprise_linux_for_ibm_z_systems / 8.0_s390x
Matched remediation archetype
Resource exhaustion and denial of service
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
- Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
- Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.
Remediate safely
- Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
- Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
- Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.