CVE intelligence and bounded remediation

CVE-2023-50761 — The signature of a digitally signed S/MIME email message may optionally specify the signature creation date and time

Medium CVSS 4.3

The signature of a digitally signed S/MIME email message may optionally specify the signature creation date and time. If present, Thunderbird did not compare the signature creation date with the message date and time, and displayed a valid signature despite a date or time mismatch. This could be used to give recipients the impression that a message was sent at a different date or time. This vulnerability affects Thunderbird < 115.6.

Severity
Medium
CVSS
4.3 (3.1)
Published
2023-12-19
CISA KEV
Not currently listed
Ecosystem
software/application

Affected products

  • mozilla / thunderbird
  • debian / debian_linux / 11.0
  • debian / debian_linux / 12.0

Matched remediation archetype

General vulnerability remediation

This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.

Check exposure

  • Confirm the affected component, deployment paths, reachable interfaces, and enabled features from inventories and configuration, without probing production destructively.
  • Compare the advisory's affected conditions with the repository lockfiles, build manifests, artifacts, and runtime inventory.
  • Identify data sensitivity, trust boundaries, and privilege level for every confirmed affected deployment.

Remediate safely

  • Apply a vendor-supported fix or remove the affected component or feature; record the selected change and its source in the repository.
  • Update direct and transitive dependency locks, generated artifacts, deployment manifests, and asset inventories together.
  • Add a regression test for the documented unsafe condition using inert inputs and preserve rollback instructions.

Authoritative sources

Complete CVE record and remediation plan

The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.