CVE intelligence and bounded remediation
CVE-2023-49957 — An issue was discovered in Dalmann OCPP.Core before 1.3.0 for OCPP (Open Charge Point Protocol) for electric vehicles
An issue was discovered in Dalmann OCPP.Core before 1.3.0 for OCPP (Open Charge Point Protocol) for electric vehicles. It permits multiple transactions with the same connectorId and idTag, contrary to the expected ConcurrentTx status. This could result in critical transaction management and billing errors. NOTE: the vendor's perspective is "Imagine you've got two cars in your family and want to charge both in parallel on the same account/token? Why should that be rejected?"
- Severity
- High
- CVSS
- 7.5 (3.1)
- Published
- 2023-12-07
- CISA KEV
- Not currently listed
- Ecosystem
- software/application
Affected products
- dallmann-consulting / open_charge_point_protocol
Matched remediation archetype
General vulnerability remediation
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Confirm the affected component, deployment paths, reachable interfaces, and enabled features from inventories and configuration, without probing production destructively.
- Compare the advisory's affected conditions with the repository lockfiles, build manifests, artifacts, and runtime inventory.
- Identify data sensitivity, trust boundaries, and privilege level for every confirmed affected deployment.
Remediate safely
- Apply a vendor-supported fix or remove the affected component or feature; record the selected change and its source in the repository.
- Update direct and transitive dependency locks, generated artifacts, deployment manifests, and asset inventories together.
- Add a regression test for the documented unsafe condition using inert inputs and preserve rollback instructions.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.