CVE intelligence and bounded remediation

CVE-2023-25171 — Kiwi TCMS, an open source test management system, does not impose rate limits in versions prior to 12.0

High CVSS 7.5

Kiwi TCMS, an open source test management system, does not impose rate limits in versions prior to 12.0. This makes it easier to attempt denial-of-service attacks against the Password reset page. An attacker could potentially send a large number of emails if they know the email addresses of users in Kiwi TCMS. Additionally that may strain SMTP resources. Users should upgrade to v12.0 or later to receive a patch. As potential workarounds, users may install and configure a rate-limiting proxy in front of Kiwi TCMS and/or configure rate limits on their email server when possible.

Severity
High
CVSS
7.5 (3.1)
Published
2023-02-15
CISA KEV
Not currently listed
Ecosystem
software/application
Weaknesses
CWE-770

Affected products

  • kiwitcms / kiwi_tcms

Matched remediation archetype

Resource exhaustion and denial of service

This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.

Check exposure

  • Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
  • Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
  • Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.

Remediate safely

  • Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
  • Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
  • Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.

Authoritative sources

Complete CVE record and remediation plan

The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.