CVE intelligence and bounded remediation

CVE-2023-20135 — Cisco Ios Xr security vulnerability

High CVSS 7

A vulnerability in Cisco IOS XR Software image verification checks could allow an authenticated, local attacker to execute arbitrary code on the underlying operating system. This vulnerability is due to a time-of-check, time-of-use (TOCTOU) race condition when an install query regarding an ISO image is performed during an install operation that uses an ISO image. An attacker could exploit this vulnerability by modifying an ISO image and then carrying out install requests in parallel. A successful exploit could allow the attacker to execute arbitrary code on an affected device.

Severity
High
CVSS
7 (3.1)
Published
2023-09-13
CISA KEV
Not currently listed
Ecosystem
operating-system
Weaknesses
CWE-347, CWE-367

Affected products

  • cisco / ios_xr

Showing 1 representative product identities from 2 source matches. Confirm exact affected versions with the linked vendor and NVD evidence.

Matched remediation archetype

Race condition, TOCTOU, and lifecycle synchronization

This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.

Check exposure

  • Map concurrent actors, shared state, lock boundaries, signals, callbacks, retries, and check-then-use sequences in the affected path.
  • Determine whether untrusted users can influence timing, object names, filesystem state, or repeated state transitions.
  • Identify clustered and multi-process behavior that repository-local tests may not represent.

Remediate safely

  • Make the sensitive state transition atomic or protect it with a consistently ordered synchronization primitive.
  • Perform authorization and invariant checks on the same authoritative object and transaction used for the operation.
  • Use unique private resources, safe ownership transfer, and idempotent operations; add deterministic concurrency regression tests.

Authoritative sources

Complete CVE record and remediation plan

The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.