CVE intelligence and bounded remediation
CVE-2022-49641 — In the Linux kernel, the following vulnerability has been resolved: sysctl: Fix data races in proc_douintvec()
In the Linux kernel, the following vulnerability has been resolved: sysctl: Fix data races in proc_douintvec(). A sysctl variable is accessed concurrently, and there is always a chance of data-race. So, all readers and writers need some basic protection to avoid load/store-tearing. This patch changes proc_douintvec() to use READ_ONCE() and WRITE_ONCE() internally to fix data-races on the sysctl side. For now, proc_douintvec() itself is tolerant to a data-race, but we still need to add annotations on the other subsystem's side.
- Severity
- Medium
- CVSS
- 4.7 (3.1)
- Published
- 2025-02-26
- CISA KEV
- Not currently listed
- Ecosystem
- linux/kernel
- Weaknesses
- CWE-362
Affected products
- linux / linux_kernel
- linux / linux_kernel / 5.19
Matched remediation archetype
Race condition, TOCTOU, and lifecycle synchronization
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Map concurrent actors, shared state, lock boundaries, signals, callbacks, retries, and check-then-use sequences in the affected path.
- Determine whether untrusted users can influence timing, object names, filesystem state, or repeated state transitions.
- Identify clustered and multi-process behavior that repository-local tests may not represent.
Remediate safely
- Make the sensitive state transition atomic or protect it with a consistently ordered synchronization primitive.
- Perform authorization and invariant checks on the same authoritative object and transaction used for the operation.
- Use unique private resources, safe ownership transfer, and idempotent operations; add deterministic concurrency regression tests.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.