CVE intelligence and bounded remediation
CVE-2022-30276 — The Motorola MOSCAD and ACE line of RTUs through 2022-05-02 omit an authentication requirement
The Motorola MOSCAD and ACE line of RTUs through 2022-05-02 omit an authentication requirement. They feature IP Gateway modules which allow for interfacing between Motorola Data Link Communication (MDLC) networks (potentially over a variety of serial, RF and/or Ethernet links) and TCP/IP networks. Communication with RTUs behind the gateway is done by means of the proprietary IPGW protocol (5001/TCP). This protocol does not have any authentication features, allowing any attacker capable of communicating with the port in question to invoke (a subset of) desired functionality.
- Severity
- High
- CVSS
- 7.5 (3.1)
- Published
- 2022-07-26
- CISA KEV
- Not currently listed
- Ecosystem
- operating-system
- Weaknesses
- CWE-306
Affected products
- motorola / moscad_ip_gateway_firmware
- motorola / ace_ip_gateway_(4600)_firmware
Matched remediation archetype
Authentication bypass and missing authentication
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Map every affected endpoint and protocol path, including alternate ports, legacy routes, recovery flows, service accounts, and machine-to-machine access.
- Confirm which deployments enable the affected authentication mode and whether the interface is reachable from untrusted networks.
- Review session, token, credential, and proxy trust configuration without attempting account takeover.
Remediate safely
- Apply the supported fix and centralize fail-closed authentication before protected request handling.
- Remove default or embedded credentials, rotate affected secrets and sessions, and bind authentication decisions to the intended audience and channel.
- Add negative tests for alternate routes, malformed or absent credentials, recovery flows, and proxy-derived identity.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.