CVE intelligence and bounded remediation

CVE-2022-30269 — Motorola ACE1000 RTUs through 2022-05-02 mishandle application integrity

High CVSS 8.8

Motorola ACE1000 RTUs through 2022-05-02 mishandle application integrity. They allow for custom application installation via either STS software, the C toolkit, or the ACE1000 Easy Configurator. In the case of the Easy Configurator, application images (as PLX/DAT/APP/CRC files) are uploaded via the Web UI. In case of the C toolkit, they are transferred and installed using SFTP/SSH. In each case, application images were found to have no authentication (in the form of firmware signing) and only relied on insecure checksums for regular integrity checks.

Severity
High
CVSS
8.8 (3.1)
Published
2022-07-26
CISA KEV
Not currently listed
Ecosystem
operating-system
Weaknesses
CWE-345

Affected products

  • motorola / ace1000_firmware

Matched remediation archetype

Supply-chain, dependency, build, and update integrity

This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.

Check exposure

  • Trace affected packages, source archives, build actions, plugins, installers, and updates from declared source to deployed artifact.
  • Confirm provenance, signatures or digests, namespace ownership, lockfile resolution, registry configuration, and build-runner trust boundaries.
  • Inventory direct, transitive, vendored, generated, and bundled copies across releases and distribution channels.

Remediate safely

  • Move to a maintained trusted artifact or remove the dependency; pin immutable identities and verify provenance and integrity before use.
  • Regenerate lockfiles and artifacts in a clean isolated build, minimize build credentials and network access, and produce an updated software bill of materials.
  • Require reviewed update policy, protected publishing, and reproducible or independently attestable builds where supported.

Authoritative sources

Complete CVE record and remediation plan

The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.