CVE intelligence and bounded remediation
CVE-2022-25622 — Siemens Simatic Cfu Diq Firmware security vulnerability
High
CVSS 7.5
The PROFINET (PNIO) stack, when integrated with the Interniche IP stack, improperly handles internal resources for TCP segments where the minimum TCP-Header length is less than defined. This could allow an attacker to create a denial of service condition for TCP services on affected devices by sending specially crafted TCP segments.
- Severity
- High
- CVSS
- 7.5 (3.1)
- Published
- 2022-04-12
- CISA KEV
- Not currently listed
- Ecosystem
- software/application
- Weaknesses
- CWE-400
Affected products
- siemens / simatic_cfu_diq_firmware
- siemens / simatic_cfu_pa_firmware
- siemens / simatic_s7-300_cpu_firmware
- siemens / simatic_s7-400h_v6_firmware
- siemens / simatic_s7-400_pn/dp_v7_firmware
- siemens / simatic_s7-410_v8_firmware
Matched remediation archetype
Resource exhaustion and denial of service
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
- Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
- Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.
Remediate safely
- Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
- Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
- Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.