CVE intelligence and bounded remediation
CVE-2022-22148 — 'Root Service' service implemented in the following Yokogawa Electric products creates some named pipe with improper ACL configuration
High
CVSS 7.8
'Root Service' service implemented in the following Yokogawa Electric products creates some named pipe with improper ACL configuration. CENTUM CS 3000 versions from R3.08.10 to R3.09.00, CENTUM VP versions from R4.01.00 to R4.03.00, from R5.01.00 to R5.04.20, and from R6.01.00 to R6.08.00, Exaopc versions from R3.72.00 to R3.79.00.
- Severity
- High
- CVSS
- 7.8 (3.1)
- Published
- 2022-03-11
- CISA KEV
- Not currently listed
- Ecosystem
- software/application
- Weaknesses
- CWE-732
Affected products
- yokogawa / centum_cs_3000_firmware
- yokogawa / centum_cs_3000_entry_firmware
- yokogawa / centum_vp_firmware
- yokogawa / centum_vp_entry_firmware
- yokogawa / exaopc
Matched remediation archetype
Privilege escalation and unsafe privilege management
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Map service accounts, operating-system identities, roles, capabilities, impersonation, set-user transitions, and administrative helper paths.
- Determine whether untrusted users or lower-privilege processes can reach the affected transition or modify inputs it trusts.
- Review file, socket, registry, device, job, container, and cloud-role permissions used before and after privilege changes.
Remediate safely
- Apply the supported fix and redesign privileged operations as a minimal, authenticated, allowlisted interface.
- Drop privileges before processing untrusted input, verify the drop succeeds, and remove unnecessary roles, capabilities, and write permissions.
- Validate ownership and permissions at time of use and add explicit lower-to-higher privilege boundary tests.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.