CVE intelligence and bounded remediation
CVE-2021-32810 — crossbeam-deque is a package of work-stealing deques for building task schedulers when programming in Rust
crossbeam-deque is a package of work-stealing deques for building task schedulers when programming in Rust. In versions prior to 0.7.4 and 0.8.0, the result of the race condition is that one or more tasks in the worker queue can be popped twice instead of other tasks that are forgotten and never popped. If tasks are allocated on the heap, this can cause double free and a memory leak. If not, this still can cause a logical bug. Crates using `Stealer::steal`, `Stealer::steal_batch`, or `Stealer::steal_batch_and_pop` are affected by this issue. This has been fixed in crossbeam-deque 0.8.1 and 0.7.4.
- Severity
- Critical
- CVSS
- 9.8 (3.1)
- Published
- 2021-08-02
- CISA KEV
- Not currently listed
- Ecosystem
- software/application
- Weaknesses
- CWE-362
Affected products
- crossbeam_project / crossbeam
- fedoraproject / fedora / 34
Matched remediation archetype
Race condition, TOCTOU, and lifecycle synchronization
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Map concurrent actors, shared state, lock boundaries, signals, callbacks, retries, and check-then-use sequences in the affected path.
- Determine whether untrusted users can influence timing, object names, filesystem state, or repeated state transitions.
- Identify clustered and multi-process behavior that repository-local tests may not represent.
Remediate safely
- Make the sensitive state transition atomic or protect it with a consistently ordered synchronization primitive.
- Perform authorization and invariant checks on the same authoritative object and transaction used for the operation.
- Use unique private resources, safe ownership transfer, and idempotent operations; add deterministic concurrency regression tests.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.