CVE intelligence and bounded remediation
CVE-2021-21404 — Syncthing is a continuous file synchronization program
Syncthing is a continuous file synchronization program. In Syncthing before version 1.15.0, the relay server `strelaysrv` can be caused to crash and exit by sending a relay message with a negative length field. Similarly, Syncthing itself can crash for the same reason if given a malformed message from a malicious relay server when attempting to join the relay. Relay joins are essentially random (from a subset of low latency relays) and Syncthing will by default restart when crashing, at which point it's likely to pick another non-malicious relay. This flaw is fixed in version 1.15.0.
- Severity
- High
- CVSS
- 7.5 (3.1)
- Published
- 2021-04-06
- CISA KEV
- Not currently listed
- Ecosystem
- software/application
- Weaknesses
- CWE-20
Affected products
- syncthing / syncthing
Matched remediation archetype
General vulnerability remediation
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Confirm the affected component, deployment paths, reachable interfaces, and enabled features from inventories and configuration, without probing production destructively.
- Compare the advisory's affected conditions with the repository lockfiles, build manifests, artifacts, and runtime inventory.
- Identify data sensitivity, trust boundaries, and privilege level for every confirmed affected deployment.
Remediate safely
- Apply a vendor-supported fix or remove the affected component or feature; record the selected change and its source in the repository.
- Update direct and transitive dependency locks, generated artifacts, deployment manifests, and asset inventories together.
- Add a regression test for the documented unsafe condition using inert inputs and preserve rollback instructions.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.