CVE intelligence and bounded remediation
CVE-2021-1312 — Cisco Elastic Services Controller security vulnerability
A vulnerability in the system resource management of Cisco Elastic Services Controller (ESC) could allow an unauthenticated, remote attacker to cause a denial of service (DoS) to the health monitor API on an affected device. The vulnerability is due to inadequate provisioning of kernel parameters for the maximum number of TCP connections and SYN backlog. An attacker could exploit this vulnerability by sending a flood of crafted TCP packets to an affected device. A successful exploit could allow the attacker to block TCP listening ports that are used by the health monitor API. This vulnerability only affects customers who use the health monitor API.
- Severity
- High
- CVSS
- 7.5 (3.1)
- Published
- 2021-01-20
- CISA KEV
- Not currently listed
- Ecosystem
- software/application
- Weaknesses
- CWE-400
Affected products
- cisco / elastic_services_controller
Matched remediation archetype
Resource exhaustion and denial of service
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
- Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
- Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.
Remediate safely
- Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
- Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
- Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.