CVE intelligence and bounded remediation
CVE-2021-0239 — Juniper Junos Os Evolved security vulnerability
In Juniper Networks Junos OS Evolved, receipt of a stream of specific genuine Layer 2 frames may cause the Advanced Forwarding Toolkit (AFT) manager process (Evo-aftmand), responsible for handling Route, Class-of-Service (CoS), Firewall operations within the packet forwarding engine (PFE) to crash and restart, leading to a Denial of Service (DoS) condition. By continuously sending this specific stream of genuine Layer 2 frames, an attacker can repeatedly crash the PFE, causing a sustained Denial of Service (DoS). This issue affects Juniper Networks Junos OS Evolved: All versions prior to 20.4R1-EVO. This issue does not affect Junos OS versions.
- Severity
- Medium
- CVSS
- 6.5 (3.1)
- Published
- 2021-04-22
- CISA KEV
- Not currently listed
- Ecosystem
- operating-system
- Weaknesses
- CWE-754
Affected products
- juniper / junos_os_evolved / 20.4
Matched remediation archetype
Resource exhaustion and denial of service
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
- Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
- Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.
Remediate safely
- Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
- Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
- Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.