CVE intelligence and bounded remediation
CVE-2020-7486 — Schneider-Electric Tricon Tcm 4351 Firmware security vulnerability
High
CVSS 7.5
**VERSION NOT SUPPORTED WHEN ASSIGNED** A vulnerability could cause TCM modules to reset when under high network load in TCM v10.4.x and in system v10.3.x. This vulnerability was discovered and remediated in version v10.5.x on August 13, 2009. TCMs from v10.5.x and on will no longer exhibit this behavior.
- Severity
- High
- CVSS
- 7.5 (3.1)
- Published
- 2020-04-16
- CISA KEV
- Not currently listed
- Ecosystem
- operating-system
- Weaknesses
- CWE-400
Affected products
- schneider-electric / tricon_tcm_4351_firmware / 10.3.x
- schneider-electric / tricon_tcm_4351_firmware / 10.4.x
- schneider-electric / tricon_tcm_4352_firmware / 10.3.x
- schneider-electric / tricon_tcm_4352_firmware / 10.4.x
- schneider-electric / tricon_tcm_4351a_firmware / 10.3.x
- schneider-electric / tricon_tcm_4351a_firmware / 10.4.x
Matched remediation archetype
Resource exhaustion and denial of service
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
- Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
- Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.
Remediate safely
- Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
- Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
- Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.