CVE intelligence and bounded remediation
CVE-2020-3571 — Cisco Firepower Threat Defense security vulnerability
A vulnerability in the ICMP ingress packet processing of Cisco Firepower Threat Defense (FTD) Software for Cisco Firepower 4110 appliances could allow an unauthenticated, remote attacker to cause a denial of service (DoS) condition on an affected device. The vulnerability is due to incomplete input validation upon receiving ICMP packets. An attacker could exploit this vulnerability by sending a high number of crafted ICMP or ICMPv6 packets to an affected device. A successful exploit could allow the attacker to cause a memory exhaustion condition that may result in an unexpected reload. No manual intervention is needed to recover the device after the reload.
- Severity
- High
- CVSS
- 8.6 (3.1)
- Published
- 2020-10-21
- CISA KEV
- Not currently listed
- Ecosystem
- software/application
- Weaknesses
- CWE-400, CWE-20
Affected products
- cisco / firepower_threat_defense
Matched remediation archetype
Resource exhaustion and denial of service
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
- Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
- Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.
Remediate safely
- Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
- Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
- Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.