CVE intelligence and bounded remediation

CVE-2020-1881 — Huawei Nip6800 Firmware security vulnerability

High CVSS 7.5

NIP6800;Secospace USG6600;USG9500 products with versions of V500R001C30; V500R001C60SPC500; V500R005C00SPC100 have have a resource management error vulnerability. An attacker needs to perform specific operations to trigger a function of the affected device. Due to improper resource management of the function, the vulnerability can be exploited to cause service abnormal on affected devices.

Severity
High
CVSS
7.5 (3.1)
Published
2020-02-28
CISA KEV
Not currently listed
Ecosystem
operating-system

Affected products

  • huawei / nip6800_firmware / v500r001c30
  • huawei / secospace_usg6600_firmware / v500r001c30spc200
  • huawei / secospace_usg6600_firmware / v500r001c30spc600
  • huawei / usg9500_firmware / v500r001c30spc200
  • huawei / usg9500_firmware / v500r001c30spc600
  • huawei / oceanstor_5310_firmware / v500r007c60spc100

Matched remediation archetype

General vulnerability remediation

This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.

Check exposure

  • Confirm the affected component, deployment paths, reachable interfaces, and enabled features from inventories and configuration, without probing production destructively.
  • Compare the advisory's affected conditions with the repository lockfiles, build manifests, artifacts, and runtime inventory.
  • Identify data sensitivity, trust boundaries, and privilege level for every confirmed affected deployment.

Remediate safely

  • Apply a vendor-supported fix or remove the affected component or feature; record the selected change and its source in the repository.
  • Update direct and transitive dependency locks, generated artifacts, deployment manifests, and asset inventories together.
  • Add a regression test for the documented unsafe condition using inert inputs and preserve rollback instructions.

Authoritative sources

Complete CVE record and remediation plan

The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.