CVE intelligence and bounded remediation
CVE-2020-1827 — Huawei Nip6800 Firmware security vulnerability
High
CVSS 7.5
Huawei NIP6800 versions V500R001C30, V500R001C60SPC500, and V500R005C00SPC100; and Secospace USG6600 and USG9500 versions V500R001C30SPC200, V500R001C30SPC600, V500R001C60SPC500, and V500R005C00SPC100 have an information leakage vulnerability. An attacker can exploit this vulnerability by sending specific request packets to affected devices. Successful exploit may lead to information leakage.
- Severity
- High
- CVSS
- 7.5 (3.1)
- Published
- 2020-02-17
- CISA KEV
- Not currently listed
- Ecosystem
- operating-system
- Weaknesses
- CWE-404
Affected products
- huawei / nip6800_firmware / v500r001c30
- huawei / nip6800_firmware / v500r001c60spc500
- huawei / nip6800_firmware / v500r005c00spc100
- huawei / secospace_usg6600_firmware / v500r001c30spc200
- huawei / secospace_usg6600_firmware / v500r001c30spc600
- huawei / secospace_usg6600_firmware / v500r001c60spc500
Matched remediation archetype
Resource exhaustion and denial of service
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
- Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
- Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.
Remediate safely
- Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
- Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
- Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.