CVE intelligence and bounded remediation
CVE-2020-13995 — Airforce Nitf Extract Utility security vulnerability
U.S. Air Force Sensor Data Management System extract75 has a buffer overflow that leads to code execution. An overflow in a global variable (sBuffer) leads to a Write-What-Where outcome. Writing beyond sBuffer will clobber most global variables until reaching a pointer such as DES_info or image_info. By controlling that pointer, one achieves an arbitrary write when its fields are assigned. The data written is from a potentially untrusted NITF file in the form of an integer. The attacker can gain control of the instruction pointer.
- Severity
- Critical
- CVSS
- 9.8 (3.1)
- Published
- 2020-09-25
- CISA KEV
- Not currently listed
- Ecosystem
- software/application
- Weaknesses
- CWE-787
Affected products
- airforce / nitf_extract_utility / 7.5
Matched remediation archetype
Buffer bounds, memory safety, and memory corruption
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify affected native-code versions, build flags, architectures, parsers, codecs, drivers, and input paths in all shipped artifacts.
- Determine whether untrusted data reaches the affected routine and the process privilege, sandbox, and network exposure.
- Confirm statically linked, vendored, firmware, and platform-provided copies, not only package-manager records.
Remediate safely
- Apply the maintained upstream correction or replace the affected component, then rebuild every dependent artifact from clean inputs.
- Adopt bounds-checked interfaces, validated sizes and integer conversions, clear ownership, and memory-safe components where practical.
- Enable supported compiler and runtime hardening and add sanitized tests and fuzz regression seeds derived from non-weaponized fixtures.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.