CVE intelligence and bounded remediation
CVE-2020-12926 — The Trusted Platform Modules (TPM) reference software may not properly track the number of times a failed shutdown happens
The Trusted Platform Modules (TPM) reference software may not properly track the number of times a failed shutdown happens. This can leave the TPM in a state where confidential key material in the TPM may be able to be compromised. AMD believes that the attack requires physical access of the device because the power must be repeatedly turned on and off. This potential attack may be used to change confidential information, alter executables signed by key material in the TPM, or create a denial of service of the device.
- Severity
- Medium
- CVSS
- 6.4 (3.1)
- Published
- 2020-11-12
- CISA KEV
- Not currently listed
- Ecosystem
- software/application
- Weaknesses
- CWE-367
Affected products
- amd / trusted_platform_modules_reference
Matched remediation archetype
Race condition, TOCTOU, and lifecycle synchronization
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Map concurrent actors, shared state, lock boundaries, signals, callbacks, retries, and check-then-use sequences in the affected path.
- Determine whether untrusted users can influence timing, object names, filesystem state, or repeated state transitions.
- Identify clustered and multi-process behavior that repository-local tests may not represent.
Remediate safely
- Make the sensitive state transition atomic or protect it with a consistently ordered synchronization primitive.
- Perform authorization and invariant checks on the same authoritative object and transaction used for the operation.
- Use unique private resources, safe ownership transfer, and idempotent operations; add deterministic concurrency regression tests.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.