CVE intelligence and bounded remediation
CVE-2020-12526 — TwinCAT OPC UA Server in versions up to 2.3.0.12 and IPC Diagnostics UA Server in versions up to 3.1.0.1 from Beckhoff Automation GmbH & Co
TwinCAT OPC UA Server in versions up to 2.3.0.12 and IPC Diagnostics UA Server in versions up to 3.1.0.1 from Beckhoff Automation GmbH & Co. KG are vulnerable to denial of service attacks. The attacker needs to send several specifically crafted requests to the running OPC UA server. After some of these requests the OPC UA server is no longer responsive to any client. This is without effect to the real-time functionality of IPCs.
- Severity
- Medium
- CVSS
- 5.3 (3.1)
- Published
- 2021-05-13
- CISA KEV
- Not currently listed
- Ecosystem
- software/application
- Weaknesses
- CWE-20
Affected products
- beckhoff / ipc_diagnostics_ua_server
- beckhoff / tf6100
- beckhoff / twincat_opc_ua_server
Matched remediation archetype
Resource exhaustion and denial of service
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
- Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
- Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.
Remediate safely
- Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
- Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
- Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.