CVE intelligence and bounded remediation

CVE-2019-6474 — Isc Kea security vulnerability

Medium CVSS 6.5

A missing check on incoming client requests can be exploited to cause a situation where the Kea server's lease storage contains leases which are rejected as invalid when the server tries to load leases from storage on restart. If the number of such leases exceeds a hard-coded limit in the Kea code, a server trying to restart will conclude that there is a problem with its lease store and give up. Versions affected: 1.4.0 to 1.5.0, 1.6.0-beta1, and 1.6.0-beta2

Severity
Medium
CVSS
6.5 (3.1)
Published
2019-10-16
CISA KEV
Not currently listed
Ecosystem
software/application
Weaknesses
CWE-772

Affected products

  • isc / kea
  • isc / kea / 1.6.0

Showing 2 representative product identities from 3 source matches. Confirm exact affected versions with the linked vendor and NVD evidence.

Matched remediation archetype

General vulnerability remediation

This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.

Check exposure

  • Confirm the affected component, deployment paths, reachable interfaces, and enabled features from inventories and configuration, without probing production destructively.
  • Compare the advisory's affected conditions with the repository lockfiles, build manifests, artifacts, and runtime inventory.
  • Identify data sensitivity, trust boundaries, and privilege level for every confirmed affected deployment.

Remediate safely

  • Apply a vendor-supported fix or remove the affected component or feature; record the selected change and its source in the repository.
  • Update direct and transitive dependency locks, generated artifacts, deployment manifests, and asset inventories together.
  • Add a regression test for the documented unsafe condition using inert inputs and preserve rollback instructions.

Authoritative sources

Complete CVE record and remediation plan

The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.