CVE intelligence and bounded remediation
CVE-2019-19194 — Telink-Semi Tlsr8258 Ble Sdk security vulnerability
The Bluetooth Low Energy Secure Manager Protocol (SMP) implementation on Telink Semiconductor BLE SDK versions before November 2019 for TLSR8x5x through 3.4.0, TLSR823x through 1.3.0, and TLSR826x through 3.3 devices installs a zero long term key (LTK) if an out-of-order link-layer encryption request is received during Secure Connections pairing. An attacker in radio range can have arbitrary read/write access to protected GATT service data, cause a device crash, or possibly control a device's function by establishing an encrypted session with the zero LTK.
- Severity
- High
- CVSS
- 8.8 (3.1)
- Published
- 2020-02-12
- CISA KEV
- Not currently listed
- Ecosystem
- software/application
Affected products
- telink-semi / tlsr8258_ble_sdk
- telink-semi / tlsr8269_ble_sdk
- telink-semi / tlsr8253_ble_sdk
- telink-semi / tlsr8251_ble_sdk
- telink-semi / tlsr8232_ble_sdk
Matched remediation archetype
General vulnerability remediation
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Confirm the affected component, deployment paths, reachable interfaces, and enabled features from inventories and configuration, without probing production destructively.
- Compare the advisory's affected conditions with the repository lockfiles, build manifests, artifacts, and runtime inventory.
- Identify data sensitivity, trust boundaries, and privilege level for every confirmed affected deployment.
Remediate safely
- Apply a vendor-supported fix or remove the affected component or feature; record the selected change and its source in the repository.
- Update direct and transitive dependency locks, generated artifacts, deployment manifests, and asset inventories together.
- Add a regression test for the documented unsafe condition using inert inputs and preserve rollback instructions.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.