CVE intelligence and bounded remediation
CVE-2019-16026 — Cisco Staros security vulnerability
A vulnerability in the implementation of the Stream Control Transmission Protocol (SCTP) on Cisco Mobility Management Entity (MME) could allow an unauthenticated, remote attacker to cause a denial of service (DoS) condition on an eNodeB that is connected to an affected device. The vulnerability is due to insufficient input validation of SCTP traffic. An attacker could exploit this vulnerability by leveraging a man-in-the-middle position between the eNodeB and the MME and then sending a crafted SCTP message to the MME. A successful exploit would cause the MME to stop sending SCTP messages to the eNodeB, triggering a DoS condition.
- Severity
- Medium
- CVSS
- 6.8 (3.0)
- Published
- 2020-01-26
- CISA KEV
- Not currently listed
- Ecosystem
- operating-system
- Weaknesses
- CWE-20
Affected products
- cisco / staros
Matched remediation archetype
Resource exhaustion and denial of service
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
- Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
- Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.
Remediate safely
- Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
- Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
- Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.