CVE intelligence and bounded remediation
CVE-2019-15265 — Cisco Aironet 1540 Firmware security vulnerability
A vulnerability in the bridge protocol data unit (BPDU) forwarding functionality of Cisco Aironet Access Points (APs) could allow an unauthenticated, adjacent attacker to cause an AP port to go into an error disabled state. The vulnerability occurs because BPDUs received from specific wireless clients are forwarded incorrectly. An attacker could exploit this vulnerability on the wireless network by sending a steady stream of crafted BPDU frames. A successful exploit could allow the attacker to cause a limited denial of service (DoS) attack because an AP port could go offline.
- Severity
- High
- CVSS
- 7.4 (3.0)
- Published
- 2019-10-16
- CISA KEV
- Not currently listed
- Ecosystem
- operating-system
- Weaknesses
- CWE-20
Affected products
- cisco / aironet_1540_firmware
- cisco / aironet_1560_firmware
- cisco / aironet_1800_firmware
- cisco / aironet_2800_firmware
Matched remediation archetype
Resource exhaustion and denial of service
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
- Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
- Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.
Remediate safely
- Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
- Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
- Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.