CVE intelligence and bounded remediation
CVE-2019-0075 — Juniper Junos security vulnerability
A vulnerability in the srxpfe process on Protocol Independent Multicast (PIM) enabled SRX series devices may lead to crash of the srxpfe process and an FPC reboot while processing (PIM) messages. Sustained receipt of these packets may lead to an extended denial of service condition. Affected releases are Juniper Networks Junos OS on SRX Series: 12.3X48 versions prior to 12.3X48-D80; 15.1X49 versions prior to 15.1X49-D160; 17.3 versions prior to 17.3R3-S7 17.4 versions prior to 17.4R2-S8, 17.4R3; 18.1 versions prior to 18.1R3-S8; 18.2 versions prior to 18.2R2; 18.3 versions prior to 18.3R2.
- Severity
- High
- CVSS
- 7.5 (3.1)
- Published
- 2019-10-09
- CISA KEV
- Not currently listed
- Ecosystem
- operating-system
Affected products
- juniper / junos / 12.3x48
- juniper / junos / 15.1x49
Matched remediation archetype
Resource exhaustion and denial of service
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
- Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
- Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.
Remediate safely
- Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
- Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
- Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.