CVE intelligence and bounded remediation
CVE-2018-9444 — In ih264d_video_decode of ih264d_api.c there is a possible resource exhaustion due to an infinite loop
High
CVSS 7.1
In ih264d_video_decode of ih264d_api.c there is a possible resource exhaustion due to an infinite loop. This could lead to remote temporary device denial of service (remote hang or reboot) with no additional execution privileges needed. User interaction is needed for exploitation. Product: Android Versions: Android-6.0 Android-6.0.1 Android-7.0 Android-7.1.1 Android-7.1.2 Android ID: A-63521984.
- Severity
- High
- CVSS
- 7.1 (2.0)
- Published
- 2018-11-06
- CISA KEV
- Not currently listed
- Ecosystem
- operating-system
- Weaknesses
- CWE-835
Affected products
- google / android / 6.0
- google / android / 6.0.1
- google / android / 7.0
- google / android / 7.1.1
- google / android / 7.1.2
Matched remediation archetype
Resource exhaustion and denial of service
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
- Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
- Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.
Remediate safely
- Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
- Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
- Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.